
Breathing New Life Into a Local Landmark
At Omni Commercial Group, we take great pride in the work we do—but there's something uniquely special about projects that take place right in our own backyard. In the summer of 2024, we had the privilege of partnering with Larkin High School in Elgin, Illinois, to revitalize one of the most important spaces in their building: the auditorium.
This project wasn’t just about construction, it was about creating an environment that uplifts performance, accessibility, and experience for students, staff, and the greater Elgin community.
A Complete Auditorium Transformation
The renovation touched nearly every aspect of the auditorium. Our scope of work included:
- Brand-new auditorium seating
- Durable and attractive epoxy flooring
- Upgraded carpeting for comfort and aesthetics
- ADA-compliant access ramp to improve accessibility
- Modernized auditorium electrical systems
- Upgraded house lighting to improve visibility and efficiency
- New electronic theatrical lighting control systems
- A completely overhauled audio system with new controls and speaker arrays
- Installation of a new 25-foot video screen and projection equipment
The project was completed in August 2024, just in time for a new school year and performance season.
Real Results That Resonate
We were honored to receive glowing feedback from Adam Baxter, Auditorium Manager at Larkin High School, after the system upgrades were put to the test during their musical production. His message underscores exactly why we do what we do.
“We're running our musical this weekend and the vocals are loud and clear in a way we've never been able to hear when competing with a full pit orchestra,” Adam shared. “Threshold took my notes about the challenges and limitations of the room and gave us a design that was exactly what this space needed.”
Adam went on to praise the improvements made to the seating, lighting, projection, and infrastructure—areas that had long needed attention. But it was the new audio system that made the biggest difference for their performances.
“The old speaker system was good for meetings and music playback but trying to get performer vocal mics louder than a full pit orchestra, jazz band, or rock show was full of challenges,” he noted. “This new system has been plenty loud with headroom to spare.”
He closed his remarks with appreciation not just for the outcome, but for the collaborative approach Omni took throughout the process.
“I really appreciate being able to contribute in the process… Feel free to pass along thanks to Mark Carlson, Threshold, Omni, and anyone else involved.”
Collaboration in Action
One of the key reasons this project succeeded so well was the collaborative effort between the Larkin team, Threshold, and our crew at Omni. We believe construction is most effective when it's grounded in communication—when every stakeholder has a voice and every challenge is met with creative, technical solutions.
We’re especially proud of how our team listened to and integrated feedback from those who know the space best—like Adam. His insights were crucial to creating a performance-ready environment that truly met the school’s unique needs.
Building for Our Community
As a union-affiliated, woman-owned business headquartered in Elgin, working on a project like this for Larkin High School holds personal meaning. It’s more than just a job—it’s an opportunity to invest in the future of our own community and create spaces that serve, inspire, and elevate.
At Omni Commercial Group, we’re passionate about building better environments. Whether it’s an auditorium, office space, retail location, or public facility, our commitment to craftsmanship, safety, and communication remains at the heart of everything we do.
Let’s Build What Matters—Together
Have a community, commercial, or educational facility that needs a refresh? We’re ready to bring your vision to life—just like we did for Larkin.








